---
title: "To Do"
url: "https://help.maxon.net/c4d/en-us/Content/html/TODOWORLD-TODOWORLD.html"
element_id: "TODOWORLD"
group_id: "TODOWORLD"
description: "If numerous people are working on the same Project it can be very useful to add comments or to create a to-do list for specific tasks. Cinema 4D offers 2 …"
---

## To Do

If numerous people are working on the same Project it can be very useful to add comments or to create a to-do list for specific tasks. Cinema 4D offers 2 ways of doing this:

- You can assign a **To Do** tag to specific objects
- Timeline markers offer a **Task** option\
  Comments can be added at both locations.

The **Project Settings** menu offers a **To Do** tab in which all of a Projects comments added to the above mentioned locations can be collected and viewed:

![Image: 035550.jpg](https://help.maxon.net/c4d/en-us/Content/Resources/Images/035550.jpg)\
Comments collected from tags and Markers are displayed in the **Task** tab and can be set to **Done** in the corresponding tab.

The **Task** and **Done** tabs are shown in the image above. The **Task** tab contains all tasks that have not been completed, which can be moved to the **Done** tab (and back to the **Task** tab, if necessary) when completed.

> **Tip:** Tip:Note that elements added via XRefs cannot be marked as **Done** in the master file.

Also take a look at the [Doodle](https://help.maxon.net/c4d/en-us/Content/html/32186.html.md) function with regard to making notes in the Viewport.
